Skip to content

Forward Deployed AI Engineering

Your AI,finally inproduction.

Lumelia sends engineers inside your company to turn stalled pilots and manual workflows into running systems. Six to eight weeks. Measured.

Discuss a Production AI Sprint ↗
SYS.STATUS: ASSEMBLING
WK 00Diagnosis
Autopsy of a pilot

The demo
went well.

Then the pilot met your real data, your ERP, your compliance team. It has been in staging ever since. You funded the prototype — what you got was a slide deck and a recurring meeting. Most enterprise AI dies in the last mile: after the promise, before the production.
  • 01The prototype has no owner.
    UNOWNED
  • 02The workflow runs on spreadsheets.
    MANUAL
  • 03The integrations were never built.
    NOT WIRED
  • 04Nobody defined what “working” means.
    UNDEFINED
  • 05Nothing was ever measured.
    UNMEASURED

“We don’t need another pilot. We need the thing to run.”

— every COO we have worked with

WK 00Why AI projects die
And the countermeasure

Four causes of death.
Four countermeasures.

1

Built on clean data.

The demo ran on a sample CSV. Production runs on your records — duplicates, typos, edge cases.

Countermeasure

Week one, we build on your real data. The ugly records are the spec.

2

No owner after the demo.

The vendor shipped a prototype and left. Nobody inside owns the outcome.

Countermeasure

An engineer on your floor, accountable to a number you both signed.

3

No path through compliance.

Legal and IT discovered the project in month four. It never recovered.

Countermeasure

Approval gates, audit trail and rollback — designed on day one.

4

Nobody defined “working”.

Without a baseline, every result is an opinion. Opinions don’t get budget.

Countermeasure

KPIs signed at kickoff. Measured in production. Reported after delivery.

WK 01–08The Production AI Sprint
One workflow. In production.

Eight weeks.
One workflow.
Shipped.

We deploy one priority workflow into production — with your real data, your real users, human controls and live integrations. The KPIs are signed at kickoff and reported after delivery.

What it is not

  • a proof of concept
  • a discovery workshop
  • a strategy recommendation
  • a shadow tool
  1. GATE 01Weeks 1–2

    Mapping & baseline

    We sit with your operators. We watch the work, not the org chart. We count what the workflow costs today — and we sign the number we will move.

  2. GATE 02Weeks 3–5

    Build on real data

    Real records, real edge cases, real integrations — CRM, ERP, email, databases. No sandbox. No sample CSV.

  3. GATE 03Weeks 6–7

    Validation with your team

    Your operators run it on live volume. Confidence thresholds and approval gates are tuned with them — not for them.

  4. GATE 04Week 8

    Deploy & monitor

    Production. Monitoring, alerting, audit trail, rollback. We stay on site until the signed number moves.

SCOPEWhere we deploy
Five proven grounds

Wherever the work
is still manual.

  • 01Sales operationsQuotes, pricing checks, CRM hygiene — drafted, verified, logged.
  • 02Document processingOrders, invoices, KYC files — extracted, validated, filed.
  • 03Customer supportTriage, resolution, escalation — with a human gate where it matters.
  • 04ReportingNumbers assembled nightly from your systems — not rebuilt by hand.
  • 05Internal operationsThe workflow your team maintains with spreadsheets and goodwill.

Wires into what you already run.

CRM · ERP · email · sheets — no rip-and-replace

  • SAP
  • Salesforce
  • HubSpot
  • Sage
  • Excel
  • Outlook
  • Sheets
  • Zendesk
  • Slack
  • Gmail

+ your internal tools, databases and legacy systems — read & write.

CTRLHuman control
Trust is engineered

The human stays
in charge.

Automation without control is how pilots become incidents. Every Lumelia system ships with the same four mechanisms — so your team decides what runs alone, and what waits.

Approval gates

High-impact actions wait for a named human. The system proposes; your team disposes.

Confidence thresholds

Below the threshold, it escalates. Never guesses. The threshold is tuned with your operators.

Audit trail

Every decision logged: input, output, confidence, approver. Readable by compliance, not just engineers.

Rollback

One switch returns the workflow to manual. Reversibility is a feature, not a failure.

inputorder · ticket · filemodel+ confidence scoreconf.≥ 0.92 ?yes — autoexecuted92% of volumeno — escalatehuman gatenamed approverevery decision → audit trail · rollback one switch away
CASE 01Order entry — European distributor
Anonymized under NDA

2,400 orders a month,
typed in by hand.

Bureau de traitement des commandes avant : piles de formulaires papier sur chaque bureau
Week 0 — by hand

25 min

per order, typed by hand · 0% automated

Le même bureau après : bureaux dégagés, écrans de suivi, espace calme
Week 12 — in production

3 min · 92%

per order · no human touch

The same floor, eight weeks later. The orange line is the sprint.Stack: SAP · Outlook · Excel

Week 0 — the baseline

Fourteen people spent their days copying orders from emails and PDFs into the ERP. Twenty-five minutes per order. Errors found by customers. A pilot built by a vendor the year before had never touched real data.

Weeks 1–8 — the sprint

Two Lumelia engineers moved into their office. They mapped the real workflow, built on real orders — including the ugly ones — wired the ERP and the mailbox, and put a human gate on anything unusual.

Week 12 — the measure

One month after deployment, we measured again, on live volume. The team didn’t shrink — it finally does the work it was hired for: exceptions, suppliers, customers.

92%

of orders now processed without a human

253

minutes per order, before → after

WK 12

when it was measured — in production, not in a demo

Measured in production, week 12 — baseline signed at kickoff. Client anonymized under NDA.

Deux collègues devant un écran pendant la revue de semaine 12, sur site
WK 12 — the review, on site

“For the first time, a number we signed was a number we got.”

— COO of the client company, week 12 review
Billel Helali, fondateur de Lumelia
Billel Helali — founder

The founder’s word

“A system that holds.”

“SMEs don’t need more tools. They need execution to hold, without depending on a few overwhelmed people. So growth stops getting lost along the way.”

“I’ve learned that the systems that work are the ones that leave nothing to chance. Absolute clarity. Infinite patience. Total rigor. These aren’t just values — they’re the DNA of every sprint we deploy at your company.”

— Billel Helali, founder of Lumelia
CASES 02–03More engagements
Measured the same way
CASE 02KYC review — financial services

64%

processing time per file

  • 0 SLA breaches since launch
  • Delivered in 8 weeks
  • Full audit trail for compliance
CASE 03Support triage — B2B software

43%

of tickets resolved without a human

  • −71% backlog in the first month
  • Delivered in 7 weeks
  • Human gate on refunds and churn signals
FIELDForward deployed
Humans, on your floor

We work from your floor,
not from a slide deck.

No remote ticket queue. No account manager relay. The engineers who build your system sit with the people who will use it — until it runs.
Ingénieur Lumelia travaillant sur son laptop au milieu du bureau du client, documents et whiteboards autour
Embedded, week 2. The spec is the floor, not the slide deck.
Deux ingénieurs et la responsable des opérations cartographient le workflow sur un whiteboard couvert de notes
Mapping with the people who do the work.
Ingénieure avec une tablette marchant dans l’entrepôt du client entre les rayonnages
Real data starts where the work happens.
Gros plan sur les mains d’un ingénieur, écran de monitoring en production à côté du code
Week 8. Monitoring a system that runs.
FAQFAQ
Straight answers

Questions, answered
before you ask.

SYS.STATUS: READY

Bring us the workflow
that never made it.

Discuss a Production AI Sprint
hello@lumelia.io
Response within 48h — an engineer, not a sales deck.